Full Exterior Restoration
    EXTERIOR

    Full Exterior Restoration

    Pasadena, CA November 2024 6 Weeks 32 Units
    Before
    Before
    After
    After

    The Challenge

    A 32-unit condominium complex had widespread stucco cracking, failed sealant joints at windows and doors, and outdated metal railings that no longer met current building code for height and load requirements.

    Our Solution

    We performed a full exterior restoration including stucco crack repair and refinishing, replacement of all window and door sealants, and installation of new code-compliant glass railing systems on all balconies and stairways. The building received a complete repaint with commercial-grade elastomeric coating.

    Results

    • Complete exterior transformation in 6 weeks
    • All railings now meet current California building code
    • HOA reported 30% increase in prospective buyer inquiries
    • 5-year workmanship warranty on all finishes

    Services Used

    • Stucco Crack Repair & Refinishing
    • Sealant Replacement (Windows & Doors)
    • Glass Railing Installation
    • Elastomeric Exterior Paint System
    • Color Consultation & Design
    Location
    Pasadena, CA
    Timeline
    6 Weeks
    Scope
    32 Units

    Project Gallery

    Completed stucco refinishing
    New railing system

    Have a Similar Project?

    We would love to show you what we can do for your property. Get in touch for a free consultation and project estimate.